  • Awarded MSW Integrated Project in Allahabad (2014)
  • Refurbished Compost Plant at Prayagraj and started compost production (2015)
  • Awarded Top Mover Swachhata Sarvekchhan Award 2016 for MSW (2016)
  • Awarded Integrated Solid Waste Manageme nt at Moradabad (2016)

goal-icon

  • Awarded Integrated Waste Management at Bareilly for 30 years.
  • Managed Kumbh Waste at Prayagraj. Awarded DTDC of Patiala for 10 Years
  • Prayagraj in top 20 City in Year 2020 Swachhata Award.

goal-icon

  • Managed Kumbh Waste at Prayagraj 7 Jharkhand State ULB projects acquired with minority Equity
  • Awarded Door To Door Collection of Patiala for 10 Years
  • Started DTDC at Patiala Re-negotiation Prayagraj Concession Agreement. Prayagraj in top 20 City in Year 2020 Swachhata Award

goal-icon

  • Tripartite Agreement with Prayagraj Municipality & UP State Govt for payment guarantee (2020)
  • Supplementary Agreement Signed for Moradabad Nagar Nigam for refurbishment & O&M of Compost Plant. (2020)
  • Renegotiated Concession Agreement with Moradabad and surrendered DTDC & Secondary Transportation. (2020)
  • Refurbishment of Moradabad Plant 400 MTD at the Cost of INR 2.3 Crores Production of Compost started at Moradabad. (2020)
  • Gazette of India finds mention of both Prayagraj and Moradabad Projects for grant of MDA subsidy.

goal-icon

  • Commissioned 2 TPD Plastic to Hydrocarbon Plant at Prayagraj (2021)
  • Hari Bhari awarded Bioremediation Project at Prayagraj, Moradabad & Bareilly through tendering process Installed. (2021)
  • Hari Bhari is now an Asset DeveloperOwnerOperator in MSW Infrastructure Management (2021)
  • Design & Engineering for 150 MTD RDF to Coal and Hydrocarbon Oil Project Through Pyrolysis Design and Development of Solution for Bulk Generator/Institutions of Municipal Solid Waste

goal-icon

  • Operating two cumulative 1000 TPD concessions for MSW Processing at Moradabad and Prayagraj and another Concession for DTDC for MSW at Patiala.(2022)
  • Board of Hari-Bhari decided to re-position Hari Bhari to be the leader in Municipal Solid Waste and Agri Waste Infrastructure Management and Asset Operator for Centralized and Decentralized Waste Management. (This Strategic decision was taken after 7 Years of understanding of entire MSW Value Chain from Collection & Transportation, Secondary Transportation, Intermediate Storage, Waste Processing Plant, Composting, RDF to Value (Bio-Char, Hydrocarbon through Pyrolysis). Hari Bhari Recyclable Pvt. Ltd is now an Owner-Developer-Operator of MSW Infrastructure Management Company.
  • Currently Hari-Bhari operates 2 concessionary agreements for waste processing in Moradabad and Prayagraj, both approximately 500 Tons per Day.

goal-icon

  • MOU signed with Uttar Pradesh, India Government for setting up of 2 RDF to Fuel Plants & 2 CBG Plants at Praygraj & Moradabad respectively on Build, Own & Operate basis (2023)
  • Secured Investment from Norway GreenTech AS in Hari Bhari with a 50:50 JV Company at Norway, wherein Norway would be bringing in German Technology along with Investment for Pyrolysis Plant in India.(2023)
  • LOI received fromIndian OIL forguaranteed offtake ofCBG for bothPrayagraj andMoradabadFormed Joint Venture51:49 as a subsidiaryof HB for Biogaspurificationtechnology- PECMAGINGERAcquired 51% equityin a Bio ToiletCompany -NIRGANDH (2023)